| Worked steadily through July. |
| The lumber for the screen porch was planed. These are the 2 by 7 white oaks plates and studs. |
| 22 foot 2 by 10 white oak rafters are installed carefully cut with birdmouths to fit the 3 by 12 beam. |
| View from the living room window. |
| All of the wiring was installed in the ceiling before the roof was insulated, sheathed and shingled. These two boxes are for the lights over the kitchen island. |
| View from the guest cottage bedroom. |
| Exposed framing in the overhang above the deck and door. |
| The overhang above the workshop door. |
| Plumbing is roughed in with running water and a functioning toilet. |