Thursday, 1 September 2011

Completed concrete

The second pour of concrete was completed on August 23.
Top of ICF's trowled and still wet.  Walls will be attached using the bolts extending from the concrete.

36 inch footing extends beyond the wall, inside and out.  The ICF wall is 4 feet high.

This pile on pad will hold up the deck and the roof over the deck.  It will be fully buried. 

Growing back quickly, the forest is trying to sneak in.