Saturday, September 17 in the afternoon: With the bracing removed from the concrete forms, it's now time to complete the crawlspace with fill and vapour barrier. |
Started filling with sand and noticed the sump is already full of water: the weeping tile outside of the foundation is doing its job. |
Sloped grade to the sump. Now when it rains a pump will be required to keep the crawlspace from flooding. |
To prevent flooding, trenched an overflow pipe running from the sump for 60 feet down hill towards the lake. |
The overflow pipe connects to the weeping tile at the base of the footing. |
The last 30 feet of the overflow pipe runs into the bush and is made of perforated pipe allowing water to leach into the ground. |