Installed an 8'x24' floor in the main building crawlspace. Constructed of left over bracing, forms, and sheathing used in the concrete construction. A floor over the sand will make the space more useful for storage. Finished bolting on the sill plate. Finished installing 6 mil poly with a generous flap to cover the floor joist rim board, go under the wall and overlap the outside wall vapour barrier. |