| Top of ICF's trowled and still wet. Walls will be attached using the bolts extending from the concrete. |
| 36 inch footing extends beyond the wall, inside and out. The ICF wall is 4 feet high. |
| This pile on pad will hold up the deck and the roof over the deck. It will be fully buried. |
| Growing back quickly, the forest is trying to sneak in. |
No comments:
Post a Comment