Monday 19 March 2012

Building is nigh

The floor of the main building is nearly completed.  Two side walls are built on the floor and ready to be lifted.  Working is easy because the weather is unseasonably warm and dry.  Planer shavings carpet the building site and help to keep muck off boots. 

Timbers are graded and sorted into piles according to their use as rafters or beams.  The best looking ones are tagged blue for use in areas where they will be seen the most.

This section of floor is the overhang in the main building.  Blocks of blue rigid foam provide R30 insulation.  Any gaps in the blue foam were sealed with sprayed yellow foam insulation.  Ducts for the heating system are installed while the cavity in the floor is still accessible.  The boards are part of the side wall.  When that four ply post is stood up it will be under the main beam.

No comments:

Post a Comment